CONSTRUCTION ENGINEERING
Lake Oswego City Hall – Lake Oswego, OR
Worked on reshoring and various other structural challenges during construction.
Applied Materials Project Paragon – Sunnyvale, CA
Engineering support for Hoffman Construction during the construction of this large fab facility.
Stevens Ranch Library – Bend, OR
Construction engineering support for Pence Kelly during this unique construction.
Oregon State Capitol – Salem, OR
Design of support of first floor and granite exterior walls during seismic upgrade to base-isolation system.
Intel Eagle – Chandler, AZ
New very large fab facility with multiple structural challenges.
Benson High School – Portland, OR
Coordinated with ACCO on temporary strength and stability to this large campus seismic upgrade and addition.
Nike Merchandising Building
Design of temporary conditions such as reshoring, shoring over ring road, crane and equipment loading analysis, suspended corner analysis, along with permanent design structural components of the project.
Canvas at the Press Blocks
Construction engineering work included reshoring, design of sleepers and mudsills, platforms, pump boom supports and other miscellaneous engineering items.
SAIF Addition
Coordination with LCL on reshoring, equipment loading, sequencing of compound loading issues and other construction analysis.
Grant High School
Structural analysis and design for a multitude of temporary conditions during the demo/reconstruction of the existing high school. Work lasted 3 years and included temporary bracing designs, shoring designs, basement stability and permanent design for various components.
Sullivan’s Gulch Apartments
Analysis and design of site excavation stability bracing, reshoring, platform analysis, phasing of temporary loading and other structural analysis during the course of the project.
UW West Village Garage
Construction engineering work included coordination with Hoffman Construction on the design of a cost-effective reshoring system.
140 Columbia Street
Construction engineering work included reshoring, analysis of existing bunker garage structure, design of sleepers and mudsills, platforms, pump boom supports and other miscellaneous engineering items.
4th and Montgomery Building
Construction engineering work included reshoring, analysis of shoring solutions at tall lift, design of sleepers and mudsills, platforms, pump boom supports and other miscellaneous engineering items.
Additional Projects
Legacy Emanuel West; Intel D1X-Mod 3 Fab; Conway Blocks; King and Parks Building; Manassas Micron Fab; Nike IHM Tilt-up; Block 136; Block 20; Knight Cancer Research Building; Via West II; Oregon Convention Center; Whitman Elementary School; Jefferson Station; Reed College Residence Hall; Beacon Building Lake Oswego; New Athey Creek Middle School; Albina Library; Deschutes County Courthouse; Goodwill Superstore; U-Store Pearl; SeaTac upgrades
ANALYSIS & DESIGN
Oregon State University HCIC Building
Worked with Andersen Construction on the sequencing, bracing, stability and other various aspects of this new high-tech CLT-MPP structure.
Bull Run Water Filtration
Worked with Ox Concrete and Pence Kelly on the expansion of the water supply facility in Gresham, Oregon.
Willamette Valley Water Supply
Worked with Sundt Construction and the ownership team on various construction-related issues on this seismically-resilient project.
Henry Building
Structural design that included review of loading on floors and roof, design of stair and guardrails, sidewalk access door and grease interceptor frame.
NCRD in Nehalem
Gravity and lateral analysis of historical AE Doyle building in Nehalem, Oregon. Work included voluntary seismic upgrade to the (2) original phases of the construction.
Additional Projects
Belmont Loop; Chinook Sales & Service; Seaside Middle School; Logue Equine Barn; Centerline Solutions Telecommunications projects across the US; First Logistex FAA projects around the globe; Tom’s Restaurant in Seaside; Cannon Beach flood impact analysis; Northstar Chemical; Bond Street Astoria sidewalk reconstruction; Winter Street House; St. Helens pump house; Tillamook Transfer Stations
LEGAL, DUE-DILIGENCE & PEER REVIEWS
Alameda Landslide
Conducted a site visit at the City’s request to assess the structural safety and stability of (2) homes damaged by a landslide.
Grand Coulee Fire Station
Worked with the owner, the EOR and the legal teams on review, modifications and acceptance of this structure, which had many non-conforming aspects to its construction.
LA Metro Garage
Research, structural analysis and forensic analysis of a post-tensioned concrete building which partially collapsed during construction.
Multnomah County Boathouse
Research, structural analysis and forensic analysis of a floating structure that partially sunk during launching. Work included buoyancy calculations, stability analysis and risk exposure estimates.
Hyatt Centric
Coordination with Mortenson Construction and completion of a peer review of the shoring and reshoring design for this 16-story concrete building structure.
Additional Projects
Lake Oswego Tram; Oregon Convention Center; Viking Motel; Cannon Beach City Hall; Cannon Beach Academy; DeGarde Brewing; Cannon Beach Elementary School Gymnasium; BMW of Tigard; Veteran’s Memorial Coliseum
ART-RELATED
Seattle Quarry Rings
Coordinated with the artist Adam Kuby on the design and construction of these rings for bird nesting in a park adjacent to Lake Union.
U of O – Molecular Protein Sculpture
Coordinated with the famous Byron Rubin on this University of Oregon molecular sculpture, completed analysis and design of the structure, its anchorage, and installation.
River Bridge Exhibits
Structural consulting and analysis for a public artwork project.
Hillsboro Brookwood Overcrossing Screenwall
We coordinated with the City of Hillsboro, Cliff Garten Studio, and ODOT on the design and the construction of the art screenwall that was installed on the exterior of the Brookwood Bridge over Rt. 26.
Al Arfaj Art in Kuwait
Coordination with artist and design of 25′ tall steel artwork display in a courtyard in Kuwait.
Additional Projects
Borrello Hillsboro Public Art; Tigard Street Heritage Trail; Elemental sequence art; RoC Korean Fellowship Church; Metro Expo; Wirick Earth House; Kuby Alluvion Art, OMSI Coastal Discovery Center
MERCY CORPS VOLUNTEER WORK
Mercy Corps Afghanistan
Completed a 3-week humanitarian trip to Afghanistan with Mercy Corps in the summer of 2018 to Kabul and Fayzabad in the northeast. Inspected, reviewed and discussed design of community centers, medical clinics, schools and water canals.
Mercy Corps Democratic Republic of the Congo
Completed (2) 2-week humanitarian trips with Mercy Corps in the spring and summer of 2019 to Goma and Bakavu in the Kivu province of eastern DR Congo. Inspected, reviewed and discussed design of tap stands, concrete reservoirs and a water treatment plant.
Mercy Corps Elementary Schools
Development of a Property Conditions Assessment guidebook for assessing the condition of the existing buildings at various school sites.
Mercy Corps Maternity Ward
Development of Structural Repair plans, details and guidelines for a concrete maternity ward structure.
Additional Projects
Mercy Corps Guatemala; Mercy Corps Puerto Rico; Mercy Corps NW Syria